- January 22, 2026 at 8:57 am #49519
Hey! The speed advantage is dramatic and could really help your tight schedule! Several dozen rods can be installed in a single day for a small house, and a large pile field can be erected in just a few days. Compare this to traditional methods: installing a strip foundation, even for a small structure, would require about a week, followed by another month for the concrete mixture to dry. That’s over a month of waiting before you can proceed with construction! With screw piles, you get immediate load-bearing capability – you can start building right away after installation. The specialized pile installation equipment drives piles efficiently, and because construction requires no major excavation work, you save significant time on site preparation. There’s no waiting for concrete forms to be built, no concrete pouring delays, no curing time, and no weather-related concrete pouring restrictions. The equipment works quickly regardless of weather conditions (within reason). For a typical residential project, you could have your entire foundation completed and ready for construction in 1-2 days versus 5-6 weeks for traditional concrete. Details at https://features-of-screw-piles.blogspot.com/2025/08/what-equipment-is-needed-for-pile.html This time savings translates to reduced labor costs, shorter equipment rental periods, and faster project completion – making screw piles ideal for projects with tight deadlines.
You must be logged in to reply to this topic.
