Reply To: I'm thinking about interlocking

#50268
RichardSnow

We had a similar problem in Etobicoke with standing water after every rain. We didn’t just replace the pavement; we actually redesigned the entire layout of the front yard through https://oakshs.ca/etobicoke-interlocking-services/ . They first measured the water level and showed us where the water should drain. The project included slope adjustments and thoughtful foundation preparation. After the project, the surface remains dry even during heavy rainfall. I personally advise against skimping on the planning stage, because the appearance can be altered, but an incorrect slope is expensive to fix later. For us, everything went smoothly and stress-free.